

Wedding Marquee
We just completed the full electrical installation for a wedding marquee at Oakley Hall including a kitchen capable of serving 300 guests. Everything completed on time for the first events already booked in!


Hawley Church
Hawley Church started out as a more unusual electrical inspection! We identified and fixed multiple items including: 1. Upgrade of distribution boards 2. Replacement of damaged cables 3. Upgrade lights to led 4. Replaced tungsten flood lights The upgrade of the lights massively reduced the energy consumption. If you look at the picture, each hanging light was using over 300w and there were 15 sets of these totaling 4.5Kw. By replacing these with LED's, we reduced the total d